House Renovation – Room Updates

At the minute not much is going on in our house we are currently having our boiler relocated into the loft as it’s currently in the bathroom which isn’t ideal. Here are the rooms more or less on track…

Our Bedroom

This is one of the room’s that needs the least work. The carpets & furniture have been removed and the wallpaper came off pretty easily. Only two 0f the walls need skimming, the chimney breast wall will be left as it’s going to be wallpapered.

 The Kitchen/Dining Room

This is the room that needed the most work as the kitchen was long but thin and the dining room would have been a wasted space left as it was. We removed the separating wall to make it a large spacious kitchen diner. We are currently in the process of choosing a kitchen which is exciting.

 Living Room

This room doesn’t need too much work. We’ve removed the fireplace & bricks and the room needs plastering but other than that it’s mostly cosmetic work

I hope you’ve enjoyed a sneaky peak at the progress we’ve made I’ll go into more detail at a later date & I’ll show the bathroom, hallway & Spare rooms progress later so keep following for more updates!

  photo 51e7869e-a156-42c4-879e-a8855d4c2eaa_zpsa3c584f4.jpg

Advertisements

House Renovation – Part 1

On Friday the 27th of February we finally picked up the keys to our very first home!

Since then we have been hard at it turning it into a home we will love. The house was well cared for but very old & dated and desperate for a complete  make-over.

So far it has been mainly wallpaper scraping as whoever lived in the house before us absolutely loved the stuff it was in every room of the house including the ceiling and some rooms had a lovely surprise second layer of wallpaper waiting for us. It’s fair to say wallpaper is my nemesis and I am now a fully paid up member of the I hate wallpaper club. Today we made our biggest change and knocked down the wall separating the Kitchen and dining room to make a big dining kitchen it has made a massive difference as the kitchen was rather cramped but now it big and bright.

Anyway first things first I’ll give you a tour of the house before any work was started on it.

IMG_5308

IMG_5309

IMG_5310

IMG_5311

IMG_5312

IMG_5313

IMG_5318

IMG_5786

IMG_5315

IMG_5314

IMG_5316

IMG_5819

IMG_5802

So far all of the rooms apart from the hallway, 2nd bedroom & 3rd bedroom have been stripped and carpets removed. Every room is having a complete revamp and I will be showing you the plans & ideas room by room as we go by now that the walls gone we’re just waiting for the boiler to be moved into the loft as it’s currently in the bathroom once that’s done we can start plastering and really seeing everything come together. We hope to have everything done and be moved in before the wedding which gives us 4 months so keep your fingers crossed for us!

I hope you’ll follow us for the ride 2015 is turning out to be a very very busy year!